September 2008 Photo Gallery
Stack Outlet at Full Load
Operating Condition
Turbine Hall and
Substation
240 Tonnes per Hour
Circulating Fluidized Bed
Boiler Complex
Fuel Prep Building and
Boiler
Main Coal Supply
Conveyor to Existing and
Future Boilers
Coal Storage Facility
Coal Handling Area
Coal Testing Station
Coal Testing Laboratory
Fuel Supply Conveyor
Electrostatic Precipitator
and Ash Collection
Ash Sales
60MW Turbine Generator
60MW Turbine Generator
Turbine Hall Basement
Turbine Lube Oil Pumps
Oil & Chemical Injection
Steam and Boiler Water
Sampling
Central Control Room
Distributor Control System:
Turbine Generating
60.24 MW
Distributor Control System:
Boiler in Operation
Water Treatment Area
Substation